After having been through several rounds of red-tape to renew the building licence, we were glad to hear that the Gram Panchayat (village council) finally gave us the good news – we are now allowed to continue the building process.
The actual construction has been rather slow the last few months, both due to the monsoon and the lack of permission to carry on. But our contractor, Jayaraj, has promised to gear up the pace this week so that the house can be ready by the end of this year – key in door!!
Meanwhile I have had a good process with the Architect – Niren – discussing and detailing shutters, stairs, lighting, landscaping and more. It is possible to run a project from my armchair in Oslo – 8000 kms from the building site – as long as I have professional, cooperative people working on the project locally. Chandan, my eyes and ears on site, keeps me updated several times a week so that I can follow up both contractor and architect.
Also there is an additional treatment worth mentioning for hair loss and re-growth with this post, however it does require a prescription that your doctor has signed. pharma-bi.com prices cialis You need not worry as you are buy cialis line not alone. In short works exactly like sample generic viagra which is known as most unfailing and brilliant quality anti erectile dysfunction healthcare product. levitra to have best time in bed with your dazzling bed sharing partner. Poor blood flow to the genital organs, low visit for info samples viagra levels of testosterone, heart problems, and diabetes also cause sexual dysfunction.
I include some of the sketches from the architect with details of the outdoor landscape. For some reason, the windows in the house have been omitted from the drawings.